Residential and Arterial Pavement Improvement FY23-24, I-159/I-139

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Engineering Manager            Project Engineer

Elizabeth Overstreet, P.E.                 Cesar Aguilar

Project Description

This project is designed to provide scheduled maintenance to existing asphalt paved roadways. In areas where ponding occurs, some curb, gutter, sidewalk and tree removal/replacements will be performed prior to pavement repairs. Areas requiring additional pavement improvement will include dig-outs or cold milling and overlay.

Cold milling and overlay requires the removal of the top layer (typically 2 inches) of a street and replacing it with a new layer of bituminous pavement.

The cold milling and overlay process requires full closures of streets for approximately 9 to 10 hours to allow for preparation of work (e.g. street sweeping and setting up traffic control), cold milling and overlay, material curing, and clean-up. No vehicles will be allowed on the street until the work is complete.

Project Status

Construction began July 1st with the anticipated completion date to be April 2025.

Project Location Map

Location Map

Project Budget

Engineer's Estimate $17,750,000 - $18,750,000

Project Documents

  • Bid Results (in the order received) -

Project Contact

For questions about this project, please contact Elizabeth Overstreet, Engineering Manager, at EOverstreet@TorranceCA.gov or Cesar Aguilar, Associate Engineer, at CAguilar@TorranceCA.gov

Additionally, you can reach the Public Works Department - Engineering Division at (310) 781-6900.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer