North Torrance Well Field Project, Phase III, I-108

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Engineering Manager

Stephanie Holst, P.E.     

Project Description

The North Torrance Wellfield Project (NTWFP), Phase 3 will utilize the Design-Build methodology for design and construction of new water infrastructure.  Major components include the following:

  • Demolition of existing reservoir, pumping and treatment facilities, and connections to Well No. 9 at McMaster Park;
  • Construction and equipping of two new wells;
  • Construction of chemical treatment and storage facilities;
  • Construction of a booster pump station;
  • Construction of a 2.5-million gallon storage reservoir; and
  • Site improvements, equipment, buildings, utilities, and appurtenances to support the operation of the NTWFP.

Project Status

A temporary blower-scrubber system is in operation at Well 10 to address odor concerns following a successful investigation and testing period. Staff is proceeding with permitting, purchase, and installation of a permanent blower-scrubber system for Well 10. Wells 9 and 10 are currently in operation.

Project Location

Project Documents

Project Contact

For questions about this project, please contact the Public Works Department – Engineering Division at (310) 781-6900 or at publicworksinfo@torranceca.gov.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer