City of Torrance
Home MenuI-405 at 182nd Street/ Crenshaw Boulevard Operational Improvements, T-155
Engineering Manager (City of Torrance)
Elizabeth Overstreet, P.E.
Resident Engineer (Caltrans)
Sam Gallardo
Project Description
The California Department of Transportation (Caltrans), in coordination with the City of Torrance, proposes to improve the operational conditions of the Interstate 405 (I‐405) freeway mainline, and its on‐and‐off ramps at Crenshaw Boulevard and 182nd Street in the City of Torrance, Los Angeles County, from post mile 14.4 to 15.6.
Caltrans is the lead agency under the National Environmental Policy Act (NEPA), and also the lead agency under the California Environmental Quality Act (CEQA). The proposed project is currently listed in the Federal Transportation Improvement Program (FTIP ID: LA0G874), and is included in the 2016‐2040 Southern California Association of Governments (SCAG) Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) [RTP ID: REG0703].
The purpose of the proposed project is to achieve the following objectives:
- Alleviate congestion, and improve traffic flow and operational conditions on the Interstate 405 (I‐405) mainline at the Crenshaw Boulevard/182nd Street Interchange, its on‐and‐off‐ramps, and interfacing local arterials in the City of Torrance
- Improve safety, and minimize queuing and blocking through the enhancement of confluence areas and vehicular storage on the I‐405 mainline, and through the introduction of new, protected turn movements at on‐and‐off‐ramps and interfacing local arterials
- Rebalance regional traffic circulation through an improvement in Level of Service (LOS) on the I‐405 mainline, on‐and‐off‐ramps, and at local roadway intersections, and complementary reductions in delay, out‐of‐direction travel, and Vehicle Miles Traveled (VMT)
Additional information about the project can be found on the Caltrans website here: https://dot.ca.gov/caltrans-near-me/district-7/district-7-projects/d7-i405-auxiliary-lanes-project
Project Location
Project Status
Construction began in August 2021 and is anticipated to be completed in December 2024.
Project Budget
City of Torrance
$15,300,000
Caltrans
$43,700,000
Project Documents
Project Plans
UPDATE Caltrans to mitigate dust and noise - Flyer with photos
2021-09-20 Sound Wall Demolition Press Release
2021-10-1 Clearing of Vegetation Press Release
2021-10-19 Clearing of Vegetation Press Release
2021-11-22 Mitigating Dust and Noise Press Release
2022-06-10 Bridge Demolition and Falsework Clearances Press Release
2022-10-13 Interchange Improvements and New Auxiliary Lanes
2022-10-21 Interchange Improvements and New Auxiliary Lanes
2022-12-22 Notice of Night Paving
Project Contact
City of Torrance
For more information about this project as it relates to the City of Torrance, please contact Elizabeth Overstreet at EOverstreet@Torranceca.gov.
You may also contact the Public Works Department – Engineering Division at (310) 781-6900.
Caltrans
For more information about this project as it relates to the State, please contact Sam Gallardo at samuel.gallardo@dot.ca.gov or call (310) 609-0266.