B2021-30 Bid to Furnish and Install New 400-Amp Panel for Future Electric Vehicle Charging Stations, Concrete Pad for Edison’s Surface Mounted Transformer and Required Conduits

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

The City of Torrance is seeking qualified and licensed contractors to Furnish and Install New 400-Amp Panel for Future Electric Charging Stations, Concrete Pad for Edison's Surface Mounted Transformer and Required Conduits as per the plans provided by Southern California Edison and the City of Torrance.

Bid Documents

Addendum 1

Map Plans

 


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer